Monday, September 8, 2014

Tired Is as Tired Does

It was a really loooooooong weekend. After the moving debacle (the moving truck driver showed up and his helpers never did...) I haven't been able to catch my energy back.

Surprise! Nick finished the back bathroom today. I get to take a hot shower in the morning!

So, with zero energy, I served leftover chicken gyros for dinner and prepped tomorrow's chicken wild rice soup. I don't ever want to hear someone say their kitchen is too small to cook well at home!

I put up the shower curtain and towels in the bathroom but they don't quite look right. You don't get pics of that until it's perfect. :)

My plan was to hang all the artwork tonight...I went across the street to the convince store for milk stout instead. I found $.17 on the walk there. How much interest did you earn on your savings today??? Beer + cash + couch = wheeeee!

Sunday, August 31, 2014

It's a Hot Mess

We're in...sort of. We have a toilet and a sink but I forgot to have the gas turned on so we only have cold water in the sink. Durp, durp.

Boxes are everywhere and we have our mattress on the floor. It's like glamourous camping. Lol!

I made a makeshift kitchen for the next couple of weeks too. So fancy! There's chicken gyros in the making in that crockpot. Woot woot!

We have internet though and we all know that's what really counts, right?! This technician was late and was really nice. Not quite Bobcat nice but nice enough. He dropped new line and didn't drill into my precious millwork.

I got a security system installed yesterday morning too! Complete with fire, 3-way entry, motion detection and glass break capabilities. I love technology!

Friday, August 29, 2014

It's the Final Countdown

So much getting done! I stopped at the tile store to pick up a small bit that was in so Nick could finish the back bathroom today. 

I got up at 5 am to wash the linens, pack more things, transfer the refrigerator contents, pick up the tile and schlep our hanging clothes to the new place. 

All that is done...now I'm waiting for the AT&T technician to install the U-Verse stuffs. Appointment window is 9 to 11 am and the clock is ticking. I didn't have time to make lemon bars for the technician (that's how I snagged The Bobcat) so I guess The Bobcat is stuck with me for a bit. 

The contractor agenda for the day is attic insullation and bathroom tiling. 

The Chrissy agenda is moving, meetings, rental house showings, cleaning and, as previously mentioned, schlepping. Yay!

Check out the progress:



It's almost 10 am...still counting down.  Wanna place bets on arrival time?

Wednesday, August 27, 2014

Let There Be Light

"Let there be light!" <holds hands up in dramatic, Charlton Heston fashion>

Nick and the electrician have been busy bees this week! Outlets and switches are almost all replaced and light fixtures are going in everywhere. 

Here are a few of the additions:
Back bathroom
Front bedroom

Rear porch

Front bathroom
Juan Carlos, the A/C guy, came Monday evening to install my new 2-ton Ruud unit. He stayed until almost 9:30 pm to make sure it was done in one visit, by himself. He was so kind and FAST! Unbelievable and for only $2100 for everything, I'd say it was a mega value, too.


Ugly unit, but it's hard to photographically depict cool air...
Tiling started yesterday and the back bathroom is almost done--minus the specialty marble medallions that are on back order. <disappointed face>

I'm waiting to share those pics...

I picked out cabinetry hardware last night. Thoughts?

Knobs
 
Pulls
All the cabinetry has been determined--white shaker style with some glass front uppers and a few open shelves. It'll look great with the butcher block counters!

Everything is buzzing right along! Wish I could say the same for my packing...

Monday, August 25, 2014

Don't Stop 'til You Get Enough

Friday is fast approaching! Things are getting packed up at the rental and tidied up at the new place.

Nick called yesterday evening to tell me he went to pick up the tile we ordered for my front bathroom flooring and back bathroom shower floor. It was supposed to be in Saturday. They told him it was on back order...until the END of September. Why, you ask, didn't they tell him that when he ordered it two weeks ago?! (Oh, but they could give him five pieces to start. WTH is Nick going to do with five pieces?!?)

You might also ask why I ordered from that place, against Nick's recommendation? Because the tiles were perfect...and I couldn't find them anywhere else!

Delightfully difficult to obtain marble

See?!? Anyhow, I marched right up there to "take care of business". The tiles...all of them...will be here Thursday. Sometimes it pays to be assertive. <insert smirk>

So now I won't have a finished bathroom by Friday, but at least I'm not waiting until OCTOBER!

The hardwood floors are finished and the awesome COIT duct cleaning guys are here doing disgusting work.  They were a bargin for $265.  Where's Mike Rowe when you need him?

Back bedroom

Front bedroom

I don't know if I'm glad about the amount of rocks and drywall that they pulled out of the ducts. It clearly covered up the repulsive yuck that was there before we started renovations.
 
Disgusting vent findings

Ehem, Nick just called to say his PREFERRRED tile store also dropped the ball on tile ordering and that the remainder of what we ordered from them will also not be in until Thursday. So there! Every tile shop around is mediocre at best.

I'll be back this afternoon for A/C installation!